|
YICOM has stepped into a new phase of continuous
successes. This stage is characterized by the
company's coping with the new technological progress.
|
|
Recently, it entered the world of modern technology by furnishing all of its technical departments with
new and up-to-date programs and equipment. In doing so, YICOM has taken a unique and remarkable
step especially when compared with other oil companies working in the Republic
Of Yemen.
|
|
Consequently, the company has occupied a prominent
position in contrast to other productive projects
and institutions and is a
vital constituent in Yemen's oil industry, witch is being supported by President.
Ali Abdullah Saleh. Not only that, the company is playing an important and vital
role in supervising joint
operations and oil services through participating in
all types of activities like operation duties,
production and construction of
oil plants.
|
|
Being reliable and trustworthy, it participated in
the country's development and enhanced the latter's
economy. It kept on pursuing its most important aim, which is the possession of technology,
experience and
expert. This is through its staff's participation in exploration activities,
production
activities and policies. Accordingly, the company was capable of
installing the most important
technological programs relevant to oil
exploration, production, and drilling. Its programs are regarded
as the latest
and up-to-date system available in this domain.
|
|
YICOM determined to get hold of and possess such modern
and up-to-date means, facilities and
techniques, under the supervision of the
MOM, they are being used for the first time in the Yemeni oil
industry and have
become at the fingertips of Yemeni cadres.
|
|
The following is a list of these
means:
|
|
1.
PETREL program is used in doing geological and
geophysical interpretation, designing maps and
modeling geological works; it was
provided by GeoQuset , Schlumberger . |
|
2.
ECLIPSE programs are used in modeling and mapping of oil reservoirs,
production quantity and
updating oil fields and their productions.
|
|
3.
OFM program are for the sake of overseeing the performance
and production of oil
fields,
production and calculating the amount and quantity of produced oil. |
|
Today, YICOM employees are efficiently using OFM
functionalities to follow up and monitor the wells
performance, create
cross-section to view log data with production equipments and perform decline
curve analysis. |
|
OFM
provided YICOM with an efficient method to view relate and particularly analyze
reservoir and
production data in a variety of established engineering workflows.
|
|
YICOM geoscientists and engineers are getting trained
by reservoir analysis and production
surveillance using OFM.
|
|
4.
IP programs are in carrying out petrophysical interpretations,
calculating and knowing the
properties
of oil potentials at
certain
locations. |
|
5.
WEM program is for well operation, preparation, evaluation of
production, well
maintenance and
completion.
|
|
6.FINDER DATABASE
|
|
7.
ROCK UTILITY program is used in drawing geological maps at exploratory
stages, construct
isopach and depth maps, designing geological
sections, calculating and determining the coordinates
area and kind of sections as well as initial oil reserves.
|
| |
|
YICOM
Can carry out studies
on oil fields in other blocks
|