JANNAH, (Block-5)
|
|
After the commercial declaration of Halewah, Dhahab and Al-Nasr field, the
operator started to
construct the Early Oil Production Phase (EOPP) facilities
in Halewah field with capacity of
30,000 Bbls/day.
|
|
A total of 26 wells were drilled in Halewah field, of witch two wells are
used for gas injection, one
well is used for water injection, one well was
temporary abandoned and one well was plugged and
abandoned.
|
|
In Dhahab field 23 wells were also drilled, of those wells two wells are used
for gas injection, two
wells were temporary abandoned and two wells were plugged
and abandoned.
|
|
20 wells were drilled in Al-Nasr field of which 6 wells are used for water
injection.
One exploratory well was drilled in Aser field and completed as
an oil producer. Four wells were
dilled in Jannah field, of witch one well
was plugged and abandoned.
|
|
In May 1997, the operator started to construct the Long Term Production Phase
(LTPP) facilities
in Halewah with capacity of 70,000 Bbls/day, which receives
the oil produced from Dhahab, AlNasr
and Halewah.
|
|