WEST-AYAD,  (Block-4)

 

Block-4 is a mature producing asset (started in 1987), which has had a number of operating companies.

In April 2001, YICOM became the operator of block-4.

* The existing facilities consist of:

◦ Central Processing unit ( Capacity 20,000 Bbls/day ).

◦ Main-pumping station and 20-inch pipeline, 204 Km long to Shabwah-Balhaf.

◦ Al-Radoum terminal on the Arabian Sea, with capacity of 500,000 Bbls.

______________________________________________________________

 
ŠAll rights reserved at YICOM 2004-2008